If installing turbines somwhere model tornado like conditions in the economic justification and need production is completed, perhaps in the future as a small-scale generators  scattered in residential areas town with a minimum wind speed required  will application.

 

(۱)-http://shahrammoradi.blogfa.com/post-63.aspx